Park Preserve Subdivision – Titusville, Florida
Completed scheduled for August 2018.
Client: Park Preserve Developers, LLC
Civil Engineer: Epic Consultants, Titusville, Florida
Challenges overcome – Maintaining water quality in existing retention area while adding more retention.
Artistry At Viera – Viera, Florida
Completion scheduled for July 2018.
Client: Morrow Construction Co., Inc.
Civil Engineer: Stantec, Sarasota, Florida
Challenges overcome – Road widening and median work in most congested part of Viera, tight schedule, coordination with vertical trades while constructing project.
Spacecraft Integration Facility – Merritt Island, Florida
Completed in June 2018.
Client: Hensel Phelps
Civil Engineer: BRPH, Melbourne, Florida
Challenges overcome – Government project, multiple layers of inspectors and authorities with differing requirements and expectations.
Holiday Inn Express – Melbourne, Florida
Completed in January 2018.
Client: MPH Hotels, Inc.
Civil Engineer: BSE Engineering, Melbourne, Florida
Challenges overcome – Project completion required intense coordination with finish trades staging materials across construction site.
Titus Landing – Titusville, Florida
Completed in May 2017.
Client: Exxcel Project Management.
Civil Engineer: Honeycutt And Associates, Titusville, Florida
Challenges overcome – Owner’s lean development budget, working around 40 year old infrastructure with limited as-built data, fast track approach required coordination with vertical development contractors.
Cruise Terminal 10 – Port Canaveral, Florida
Completed in November 2016.
Client: H. J. High Construction Co.
Civil Engineer: Allen Engineering, Cocoa Beach, Florida
Challenges overcome – Extremely tight schedule, high water table and tidal effect due to proximity to ocean / Port Canaveral.
Titusville Logistics Facility – Titusville, Florida
Completed in April 2016.
Clients: Flagler Global Logistics (infrastructure); Marcobay Construction, Inc. (building related work.)
Civil Engineer: Allen Engineering, Cocoa Beach, Florida
Challenges overcome – Owner’s lean development budget, FDOT improvements, value engineering to simplify large bore roof drain collection system.
Ron Norris Auto Dealerships – Titusville, Florida
Completed in December 2014.
Client: RUSH Construction
Civil Engineer: Honeycutt And Associates, Titusville, Florida
Challenges overcome – Three phase project ensured public safety during construction, intense work within FDOT right-of-way.
FPL Port Saint John – Port Saint John, Florida
Completed in December 2014.
Client: Brevard Constructors, Inc.
Civil Engineer: Zachry, San Antonio, Texas
Challenges overcome – Work performed while main power plant was under construction, difficult logistics.
Golden Oak Cast Building – Disney World, Florida
Completed scheduled for June 2018.
Client: T&G Corporation
Civil Engineer: Atkins Engineering, Orlando, Florida
Challenges overcome – Discovered and remediated remnants of decades ago batch plant used for concrete production for EPCOT.
Range Communication Facility – Cape Canaveral Air Force Station, Florida
Completed in June 2018.
Client: Sauer Incorporated
Civil Engineer: Stantec, Jacksonville, Florida
Challenges overcome – Government project, multiple layers of inspectors and authorities with differing requirements and expectations.
Jetty Park Stormwater – Port Canaveral, Florida
Completed in March 2018.
Client: RUSH Construction
Civil Engineer: Construction Engineering Group, Melbourne, Florida
Challenges overcome – Worked adjacent to public utilizing waterfront park.
Wickham Park Pavilion – Melbourne, Florida
Completed in January 2018.
Client: Ivey’s Construction, Inc.
Civil Engineer: Atkins Engineering, Melbourne, Florida
Challenges overcome – Tight schedule, borderline soils required amendment to bring to suitability.
OPF-2 – Kennedy Space Center, Florida
Contract value: $677,000.
Completed in April 2017.
Client: Hensel Phelps
New Smyrna Beach Civic Center – New Smyrna Beach, Florida
Completed in July 2016.
Client: W&J Construction Corporation
Civil Engineer: Zev Cohen, Ormond Beach, Florida
Challenges overcome – Work adjacent environmentally sensitive Intracoastal Waterway, site included remnants of previous civic center, as-built information was non-existent.
KSC Data Center – Kennedy Space Center, Florida
Completed in July 2015.
Client: Sauer Incorporated
Civil Engineer: Jones Edmunds and Associates, Titusville, Florida
Challenges overcome – Federal project, Davis Bacon prevailing wages, government paperwork, KSC safety.
Wickham Park Community Center – Melbourne, Florida
Completed in December 2014.
Client: Canaveral Construction Co., Inc.
Civil Engineer: Atkins Engineering, Melbourne, Florida
Challenges overcome – Performed project with public safety foremost in importance, adjacent to operation senior center.
About Us
Ramage Contracting, Inc. has been the sitework contractor of choice for decades for work all up and down the Space Coast. The majority of our work is from repeat customers but we are always looking to expand our base. Allow us an opportunity to demonstrate the results that can be achieved with our experienced and dedicated staff!
We are proud of our reputation for on time, on budget, quality work!
Ramage performs most of the sitework in-house and employs disciplines including clearing and site demolition, earthwork and grading, utility systems (storm, sanitary, water and site fire lines) and subgrade and road base work. Most of our contracts also include a few items that we subcontract to qualified firms, these include curbs, asphalt work, striping and signage. In most cases, Ramage’s work on any given project is from start to finish, meaning that we are responsible for pushing over the first tree and for the last of the pavement striping (and every site related task in between.)
ramage contracting is family owned and operated locally
Estimating Process &
technology
PlanSwift (takeoffs.)
Vista / ProContractor (pricing.)
Carlson (earthwork.)
In the field, Ramage is on the cutting edge of technology for sitework companies. Our field forces utilize these systems in conjunction with their field work:
PlanGrid (current plans and estimating takeoffs for all projects on an iPad.)
Foundation Timecard Mobile time reporting (on iPad.)
Extremely efficient TOPCON GPS machine control system, whereby Ramage’s estimating department prepares a wire frame grid of finished surfaces, and when finished and loaded into the GPS system, satellites govern location and grade and the system communicates with grading equipment via Bluetooth technology.
Contact Us
Feel free to call us or come for a visit to our office / shop complex located in “Beautiful Downtown Mims!” - At any time!
To send a message, please complete the form below and we will respond back to your inquiry as soon as we can.
Let’s Get Started
Started
We’re Ready to Work With You
Testimonials